MACHINERY AND CONSTRUCTION DIVISION
As mining contractor, we execute mining and construction projects with professionalism, efficiency and safety.
We contract with the state (OSCE) as suppliers of goods and services.
Rented heavy machinery and other equipment.
Our staff is trained and evaluated constantly in management, operation, conduct and commitment to safety and the environment.

MACHINERY AND EQUIPMENT





PRINCIPAL WORKS

VOLCAN COMPAÑÍA MINERA S.A.A.

PURPOSE: Rental of heavy machinery and equipment: wheel loaders, hydraulic excavators, dumpers, motor grader, water tanks, lighting towers, compactors and others.
PERIOD: From July 2010 to present
REFERENCE: Work: Regrowth of sludge in Rumichaca and Mahr Tunel
  Paragsha Plant: Rental of wheel loaders
  Tailings Dam Chungar: Rental of dumpers.
  Tailings Dam Alpamarca: Rental of wheel loaders.
WORK PERFORMED: .
Earthworks, regrowth of tailings with borrow material and tailings.
Power coarse ore hopper (pit floor) loading and accumulation of ore concentrate drying.
Earthworks, construction of tailings dams.
Preparation and filling material transport, gravel and others.
Removal of excess material mass for foundation of dams, canals and ponds collector.
Maintenance of roads Ticlio, Mahr Tunel, San Cristobal, and communities Andaychagua Huayhuay, Suytucancha and Huari.
Preparation of material and concrete plant food to San Cristobal.

COMPAÑÍA MINERA MISKI MAYO S.A.C
BAYOVAR PHOSPHATE MINE – VALE

PURPOSE: Construction of platforms, road construction, slope stabilization in tailings, tailings transport and disposal of tailings.
PERIOD: From October 2010 to December 2012.
REFERENCE: Construction of primary of mineral feed 1090 - Bayovar Phosphate Mine.
Road construction tailings pile.
Transport and coarse tailings disposal.
WORK PERFORMED:
Earthmoving, construction material quarry platform.
Preparation of quarry material, loading and transportation5 km.
Land cutting.
Material removal Distance 6 km.
Formation of dumps
Scarifying, shaping, compaction of sub grade.
Conformation, watering and compaction..
Formation of protective berms.
Earthmoving, road construction, rehabilitation and maintenance of access roads for 24 months.
Loading, transportation and unloading of 5'761, 627.00 tn. wet tailings.
Disposition of 5'761, 627 tons of tailings dumps heavy in design as proposed by VALE, with planning medium and long term.

DOE RUN PERU – PROYECTO PLANTA DE FLOTACION DE FERRITAS DE ZINC

PURPOSE: Project and operation of the new zinc ferrites flotation plant.
PERIOD: From October 8, 2005 to October 31, 2008.
REFERENCE: Operation of the flotation Zinc Ferrite plant.
WORK PERFORMED:
Exploitation of pools (1, 2, 3, 4 and 5) Zinc Ferrites Huanchan - La Oroya.
Court sifting, blending, stockpiling, slope stabilization, loading, transportation and storage of 2'688, 000 tons of ferrites Zn / Ag low grade.
Construction of tailings storage pools.
Earthworks, preparation of quarry material, loading, transportation, canal building, shaping and compacting of embankment.
Production of zinc / silver concentrate low grade.
Feeding of 2'688,000 tons of ferrites (Zn /AG concentrate low grade Ag) to flotation plant.
Elimination of 1'935, 360 tons of tailings (Zn concentrate low grade) Ground – Pozas de Huanchan.
Construction of the New Copper Acid Plant.
PURPOSE: Elimination of 85,000m3 of surplus .
   
   

MINERA CORONA S.A.

PURPOSE : Tailing deposit regrowth Yauricocha Level 1.
OBJECT : Dump rental of lorries.
REFERENCE: Loan material transport and disposal quarry TOPSOIL – Relavera Yauricocha.
PERIOD: From 05 de August del 2009 al 2010.

SSK MONTAJES E INSTALACIONES S.A.C.

OBJECT : Dump rental of lorries and front loader..
REFERENCe: Contruction of the new acid plant copper - Doe Run.
PERIODO: From 05 de September 2008 to 29 February 2009.